R03 National Cycling Route in Varaždin County – Drava Route
02/11/2018, 10:51The Drava Route continues along the Mura-Drava Cycling Route from Varaždin via Ludbreg, onto Veliki Bukovac, to connect with Koprivnica-Križevci County or the EuroVelo Route (EuroVelo 13 Iron Curtain Route / Drava Route in Croatia (Slovenian border – Varaždin – Hlebine – Donji Miholjac – Hungarian border) and the Ludbreg Cycling Route which was built in 2017). This route is 36.5 km long and is in its entirety marked with cycling signposts and is mapped onto an on-line cartographic system which allows downloading of GPX files onto navigational devices.
Cycling Route R03 is 39.6 km long. The condition of the road along the whole of this Route is suitable for cyclotourism activities.
In the direction of the Varaždin – Dubrava Križovljanska Route is marked with 19 road markings located at appropriate locations which correctly direct cyclotourists from the start to the finish. Furthermore, there are 11 signposts to indicate a bike lane and a further 3 indicating the end of the bike lane. Along the total length of the R01 Cycling Route, 23.7 km (60%) of the Route is bicycle route/track and 15.9 km (40%) of the Route does not have an appropriate cycling infrastructure on the Route.
The Varaždin – Križovljanska Route in the direction of Dubrava is marked with 13 road markings located at appropriate locations which correctly direct cyclotourists from the start to the finish. Furthermore, there are 19 signposts to indicate a bike lane and a further 2 indicating the end of the bike lane. Along the total length of the R01 Cycling Route, 24.34 km (61%) of the Route is bicycle route/track and 15.26 km (39%) does not.